DL/T5255-2010水电水利工程边坡施工技术规范(英文版)
出版时间:
2019-12
版次:
1
ISBN:
9787519841300
定价:
29.00
装帧:
平装
开本:
32开
纸张:
胶版纸
页数:
53页
-
¡¡¡¡This Specification specifies the technical requirements for excavation£¬ reinforcement£¬ protection£¬ drainage and monitoring in the construction of hydropower projects£¬ as well as requirements for quality and acceptance criteria and safety control.
¡¡¡¡This Specification is applicable to slope construction of medium-or Large-sized hydropower projects. This Specification may be referenced for slope construction of other projects. Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 General provisions
5 Excavatio
5£®1 General requirements
5£®2 Slope surface clearing
5£®3 Excavation ofsoil slope
5£®4 Excavation ofrock slope
5£®5 Muckingandloading
6 Reinforcement and protection
6£®1 General requirements
6£®2 Slope protection
6£®3 Slope anchorage
6£®4 Slope retaining
6£®5 Pre-grouting
7 Slopedrainage
8 Safety monitoring during construction
9 Qualityinspection and acceptance
9£®1 Generalrequirement
9£®2 Excavation-
9£®3 Reinforcement and protection
10 Construction safety
10£®1 Generalrequirements
10£®2 Safety on excavation
10£®3 Safety on blasting
10£®4 Safety on reinforcement and protection
Appendix A £¨Normative£© Loading and unloading increment and
displacement observation interval for
pre-stressed anchor bar basic test cycle
-
内容简介:
¡¡¡¡This Specification specifies the technical requirements for excavation£¬ reinforcement£¬ protection£¬ drainage and monitoring in the construction of hydropower projects£¬ as well as requirements for quality and acceptance criteria and safety control.
¡¡¡¡This Specification is applicable to slope construction of medium-or Large-sized hydropower projects. This Specification may be referenced for slope construction of other projects.
-
目录:
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 General provisions
5 Excavatio
5£®1 General requirements
5£®2 Slope surface clearing
5£®3 Excavation ofsoil slope
5£®4 Excavation ofrock slope
5£®5 Muckingandloading
6 Reinforcement and protection
6£®1 General requirements
6£®2 Slope protection
6£®3 Slope anchorage
6£®4 Slope retaining
6£®5 Pre-grouting
7 Slopedrainage
8 Safety monitoring during construction
9 Qualityinspection and acceptance
9£®1 Generalrequirement
9£®2 Excavation-
9£®3 Reinforcement and protection
10 Construction safety
10£®1 Generalrequirements
10£®2 Safety on excavation
10£®3 Safety on blasting
10£®4 Safety on reinforcement and protection
Appendix A £¨Normative£© Loading and unloading increment and
displacement observation interval for
pre-stressed anchor bar basic test cycle
查看详情
-
全新
北京市东城区
平均发货9小时
成功完成率72.24%