  • ¡¡¡¡This Specification specifies the technical requirements for excavation£¬ reinforcement£¬ protection£¬ drainage and monitoring in the construction of hydropower projects£¬ as well as requirements for quality and acceptance criteria and safety control.
    ¡¡¡¡This Specification is applicable to slope construction of medium-or Large-sized hydropower projects. This Specification may be referenced for slope construction of other projects. Foreword 
    1 Scope
    2 Normative references
    3 Terms and definitions 
    4 General provisions 

    5 Excavatio
    5£®1 General requirements 
    5£®2 Slope surface clearing 
    5£®3 Excavation ofsoil slope
    5£®4 Excavation ofrock slope
    5£®5 Muckingandloading

    6 Reinforcement and protection
    6£®1 General requirements
    6£®2 Slope protection
    6£®3 Slope anchorage
    6£®4 Slope retaining
    6£®5 Pre-grouting 

    7 Slopedrainage
    8 Safety monitoring during construction 
    9 Qualityinspection and acceptance
    9£®1 Generalrequirement
    9£®2 Excavation-
    9£®3 Reinforcement and protection

    10 Construction safety
    10£®1 Generalrequirements
    10£®2 Safety on excavation
    10£®3 Safety on blasting
    10£®4 Safety on reinforcement and protection

    Appendix A £¨Normative£© Loading and unloading increment and
    displacement observation interval for
    pre-stressed anchor bar basic test cycle
  • 内容简介:
    ¡¡¡¡This Specification specifies the technical requirements for excavation£¬ reinforcement£¬ protection£¬ drainage and monitoring in the construction of hydropower projects£¬ as well as requirements for quality and acceptance criteria and safety control.
    ¡¡¡¡This Specification is applicable to slope construction of medium-or Large-sized hydropower projects. This Specification may be referenced for slope construction of other projects.
  • 目录:
    Foreword 
    1 Scope
    2 Normative references
    3 Terms and definitions 
    4 General provisions 

    5 Excavatio
    5£®1 General requirements 
    5£®2 Slope surface clearing 
    5£®3 Excavation ofsoil slope
    5£®4 Excavation ofrock slope
    5£®5 Muckingandloading

    6 Reinforcement and protection
    6£®1 General requirements
    6£®2 Slope protection
    6£®3 Slope anchorage
    6£®4 Slope retaining
    6£®5 Pre-grouting 

    7 Slopedrainage
    8 Safety monitoring during construction 
    9 Qualityinspection and acceptance
    9£®1 Generalrequirement
    9£®2 Excavation-
    9£®3 Reinforcement and protection

    10 Construction safety
    10£®1 Generalrequirements
    10£®2 Safety on excavation
    10£®3 Safety on blasting
    10£®4 Safety on reinforcement and protection

    Appendix A £¨Normative£© Loading and unloading increment and
    displacement observation interval for
    pre-stressed anchor bar basic test cycle