建筑师与项目管理:合同文书往来 Contractual Correspondence for Architects and Project Managers

建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
分享
扫描下方二维码分享到微信
打开微信,点击右上角”+“,
使用”扫一扫“即可将网页分享到朋友圈。
作者:
出版社: John Wiley & Sons
2007-07
版次: 1
ISBN: 9781405135146
定价: 949.00
装帧: 精装
开本: 其他
纸张: 胶版纸
页数: 281页
  • This book provides over 160 model letters, with commentary for use with all the main JCT 2005 building contracts. It concentrates on problems which can arise during a project, and draws on the author 's extensive experience as a contracts consultant. It is a companion to the author 's Standard Letters in Architectural Practice which covers more routine matters.The revised Fourth Edition takes account of:the 2005 editions of the JCT Standard Building Contract, the Intermediate Building Contract and the Minor Works Building Contract, both with their contractor 's design versions, ICD and MWDthe 2004 updates of the Standard Form of Agreement for the Appointment of an Architectchanges to case law since the last edition was published in 1996It will be an invaluable guide for architects, building surveyors and project managers. Preface to the Fourth Edition

    A  Appraisal

      A1   Client's bona tides: in doubt

      A2   If your client is a private individual (a consumer)

      A3   Fee recovery

      A4   If two separate individuals or companies wish to commission you jointly

      A5   Appointment, if architect asked to tender on fees

      A6   Brief: difficulty in obtaining decisions

      A7   Consultants: client requiring them to be appointed through the architect

      A8   Other architects, if previously commissioned

      A9   Site boundaries: unclear

      A10  Existing property, if urgent repair work required

      All  Client: if wanting to proceed with inadequate planning permission

    B  Strategic Briefing

      B1   Brief: unacceptable requirements

    C  Outline Proposals

      C1   Objections: by client

      C2   Objections: by planning authority, civic society etc

    D Detailed Proposals

      D1   Client, if no reply

      D2   Client, if another architect appointed to continue work

      D3   Client, if preference expressed for a particular sub-contractor

      D4   Client: objection to the use of sub-contractor or supplier in a design capacity

    E  Final Proposals

      E1   Client: wishing to modify brief

    Production Information

      F1   Client: declines to use a standard contract

      F2   Client: wishes to use a partnering agreement without a legally binding contract

      F3   Client: wishes to include unsuitable contractor on tender list

      F4   Client: asks you to recommend a contractor

      F5   Client: reluctance to appoint a full-time clerk of works

      F6   Consultants, if late in supplying drawings and specification

      F7   Sub-contractor or supplier, if tender not on standard form or conditions attached

      F8   Sub-contractor or supplier, if price too high

      F9   Letters of intent to sub-contractors or suppliers

    G Bills of Quantities

      G1   Drawings, if not ready

      G2   Bills of quantities, if behind programme

    H Tender Action

      H1   Client, if he wishes to accept the lowest, but unsatisfactory, tender

    J  Mobilisation

      J1  Clerk of works: letter of instruction

      J2  Letter of intent: contractor

      J3  Consents: not received from planning authority, building control, statutory undertakings

    K Construction to Practical Completion

      K1   Commencement before formal contract

      K2   Contract documents: initials missing

      K3   Contract documents: drawings amended

      K4   Drawings, schedules: not ready

      K5   Failure to give possession on the due date

      K6   Meetings: standing of minutes as a record

      K7   Master programme: alleged approval by architect

      K8   Master programme - if contractor changes it

      K9   Printed conditions and bills of quantities (or specification) not in agreement

      K10  Work not in accordance with comments on the submitted documents

      Kll  Discrepancy between bills of quantities, schedules of work,specification, architect's instruction, CDP documents or statutory requirements and contract documents, not found by the contractor

    ……

    L

    M  Feedback

    Appendix 1

    Appendix 2

    Index
  • 内容简介:
    This book provides over 160 model letters, with commentary for use with all the main JCT 2005 building contracts. It concentrates on problems which can arise during a project, and draws on the author 's extensive experience as a contracts consultant. It is a companion to the author 's Standard Letters in Architectural Practice which covers more routine matters.The revised Fourth Edition takes account of:the 2005 editions of the JCT Standard Building Contract, the Intermediate Building Contract and the Minor Works Building Contract, both with their contractor 's design versions, ICD and MWDthe 2004 updates of the Standard Form of Agreement for the Appointment of an Architectchanges to case law since the last edition was published in 1996It will be an invaluable guide for architects, building surveyors and project managers.
  • 目录:
    Preface to the Fourth Edition

    A  Appraisal

      A1   Client's bona tides: in doubt

      A2   If your client is a private individual (a consumer)

      A3   Fee recovery

      A4   If two separate individuals or companies wish to commission you jointly

      A5   Appointment, if architect asked to tender on fees

      A6   Brief: difficulty in obtaining decisions

      A7   Consultants: client requiring them to be appointed through the architect

      A8   Other architects, if previously commissioned

      A9   Site boundaries: unclear

      A10  Existing property, if urgent repair work required

      All  Client: if wanting to proceed with inadequate planning permission

    B  Strategic Briefing

      B1   Brief: unacceptable requirements

    C  Outline Proposals

      C1   Objections: by client

      C2   Objections: by planning authority, civic society etc

    D Detailed Proposals

      D1   Client, if no reply

      D2   Client, if another architect appointed to continue work

      D3   Client, if preference expressed for a particular sub-contractor

      D4   Client: objection to the use of sub-contractor or supplier in a design capacity

    E  Final Proposals

      E1   Client: wishing to modify brief

    Production Information

      F1   Client: declines to use a standard contract

      F2   Client: wishes to use a partnering agreement without a legally binding contract

      F3   Client: wishes to include unsuitable contractor on tender list

      F4   Client: asks you to recommend a contractor

      F5   Client: reluctance to appoint a full-time clerk of works

      F6   Consultants, if late in supplying drawings and specification

      F7   Sub-contractor or supplier, if tender not on standard form or conditions attached

      F8   Sub-contractor or supplier, if price too high

      F9   Letters of intent to sub-contractors or suppliers

    G Bills of Quantities

      G1   Drawings, if not ready

      G2   Bills of quantities, if behind programme

    H Tender Action

      H1   Client, if he wishes to accept the lowest, but unsatisfactory, tender

    J  Mobilisation

      J1  Clerk of works: letter of instruction

      J2  Letter of intent: contractor

      J3  Consents: not received from planning authority, building control, statutory undertakings

    K Construction to Practical Completion

      K1   Commencement before formal contract

      K2   Contract documents: initials missing

      K3   Contract documents: drawings amended

      K4   Drawings, schedules: not ready

      K5   Failure to give possession on the due date

      K6   Meetings: standing of minutes as a record

      K7   Master programme: alleged approval by architect

      K8   Master programme - if contractor changes it

      K9   Printed conditions and bills of quantities (or specification) not in agreement

      K10  Work not in accordance with comments on the submitted documents

      Kll  Discrepancy between bills of quantities, schedules of work,specification, architect's instruction, CDP documents or statutory requirements and contract documents, not found by the contractor

    ……

    L

    M  Feedback

    Appendix 1

    Appendix 2

    Index
查看详情
相关图书 / 更多
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑电气工程施工安装18D802
中国建筑标准设计研究院
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑制图
游普元
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑风格
[美]玛格丽特·弗莱彻 后浪
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑电工(2-1)/建筑工人职业技能培训教材(安装工程系列)
职业技能编委会
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑工程经济与管理研究
姜守亮、石静、王丹 著
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑材料与检测(活页式)
张思梅,李慧中,陈伟
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑CAD 第3版 微课版
罗朝宝
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑设计与施工技术
孙宁,徐巍,向梦华主编
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑施工事故案例选编
本书编写组
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑与时间:从上古城市到当代空间
唐克扬
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑巅峰艺术体验:世界宫殿建筑解读
田寒 著;清泉静读 出品
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
建筑施工安全资料管理与表格填写范例
李延青
您可能感兴趣 / 更多
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
R统计与数据可视化:社会科学数据分析实践(全彩)
David S. Brown(戴维·S.布朗
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
脑卒中干细胞移植治疗
David C. Hess
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
几何基础(英文版)
David Hilbert;Autho
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
DK机械运转的秘密 修订版
David Macaulay(大卫·麦考利
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
大众生态学
David Burnie 著;古滨河 译
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
社会正义与城市
David Harvey
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
社会理论的邀请
David Inglis
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
用于未来汽车的铅酸电池
David A.J.Rand 编;[德]Jürgen Garche、Eckhard Karden、Patrick T.Moseley、吴旭、何艺 译
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
全球大气环流导论
David Randall
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
语素导论(语言学及应用语言学名著译丛)
David Embick
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
量化民族志:一种面向大数据的研究方法
David Williamson Shaffer
建筑师与项目管理:合同文书往来  Contractual Correspondence for Architects and Project Managers
BRADDOM康复医学临床手册
David X. Cifu 主编;敖丽娟 陈文华 周谋望 译者;Henry L. Lew